B-ver's Build Thread
#152
Well today was april 1st and I dont know if it was a joke or not, but talked to Ray over at Kaaz to go pick up the diff and he said he did something special to it. So my impression was he shimmed the diff some special way to make it better then normal or something. Well when I got down to Kaaz, this is what I found.
Also Speed O Motive called, said the valve guides where no good and we needed replacements, which kinda sucks cause we are supposed to be shooting the DVD with drifting.com tomarro. Well they found some on short notice unfortunatly cause now I have to wake up in a few hours to start on that.
Kenny over at K&W autobody calls me and said "I need parts", well I've been talking to Seibon for a while and they never came to a hard decision but they finally gave in a bit and helped us out. Ring the bell, we have a new sponsor, not full but at least I got the parts needed to keep this thing going.
Thank god someone in the USA makes doors for this car. Not cheep by any means but at least its there.
Then also got the TSII hood and the oem trunk
I'm running out of time fast. Start building the motor in a few hours.
Also Speed O Motive called, said the valve guides where no good and we needed replacements, which kinda sucks cause we are supposed to be shooting the DVD with drifting.com tomarro. Well they found some on short notice unfortunatly cause now I have to wake up in a few hours to start on that.
Kenny over at K&W autobody calls me and said "I need parts", well I've been talking to Seibon for a while and they never came to a hard decision but they finally gave in a bit and helped us out. Ring the bell, we have a new sponsor, not full but at least I got the parts needed to keep this thing going.
Thank god someone in the USA makes doors for this car. Not cheep by any means but at least its there.
Then also got the TSII hood and the oem trunk
I'm running out of time fast. Start building the motor in a few hours.
#161
if you get t-boned without a cage you are FKD.
#165
Suprised no one said anything about the pink diff.
Got like 3 hours of sleep then off to the motor shop. Speed O Motive, Remeber the name when you want something done right. Brian Crower got sent the parts directly and they went over all the parts, bored the block, ballanced the crank(must say it was just about perfect from the box), weighed and matched the rods and pistons, checked the line bore with the new arp hardware, pulled the head apart, found that the valve guides were bad and we needed to do the filming for the DVD with drifting.com today so they over nighted some in, painted the block and had it all set up for us this morning at 8am. You will beable to purchase the DVD of the engine build soon on drifting.com. Here are some quick pics, Alex from drifting.com and Bill Shoemaker, great head builder.
Well, bad news, I'm still missing some important parts to get the motor together in time (main bearings) and some odds and ends. So instead of splitting my attention between things, I just have time to worry about getting the chassis together for long beach. The count down begins today and think I've found some new sponsors, Mackin Industries for some cool Rays Wheels and Cooper for some tires.
7 Days till Long Beach
Got like 3 hours of sleep then off to the motor shop. Speed O Motive, Remeber the name when you want something done right. Brian Crower got sent the parts directly and they went over all the parts, bored the block, ballanced the crank(must say it was just about perfect from the box), weighed and matched the rods and pistons, checked the line bore with the new arp hardware, pulled the head apart, found that the valve guides were bad and we needed to do the filming for the DVD with drifting.com today so they over nighted some in, painted the block and had it all set up for us this morning at 8am. You will beable to purchase the DVD of the engine build soon on drifting.com. Here are some quick pics, Alex from drifting.com and Bill Shoemaker, great head builder.
Well, bad news, I'm still missing some important parts to get the motor together in time (main bearings) and some odds and ends. So instead of splitting my attention between things, I just have time to worry about getting the chassis together for long beach. The count down begins today and think I've found some new sponsors, Mackin Industries for some cool Rays Wheels and Cooper for some tires.
7 Days till Long Beach