My NA-T project is almost complete
#1
My NA-T project is almost complete
COMPLETED PICS ON PAGE 3.
All that's left to do is wire up the Haltech and still waiting on some injectors.
Edit: A good friend of mine did all of the fabrication not to mislead anyone.
Test fit.
T
All intercooler piping and exhaust done.
I'll have better pics of the exhaust once the car is on the ground.
All that's left to do is wire up the Haltech and still waiting on some injectors.
Edit: A good friend of mine did all of the fabrication not to mislead anyone.
Test fit.
T
All intercooler piping and exhaust done.
I'll have better pics of the exhaust once the car is on the ground.
Last edited by puff; 07-19-10 at 07:10 AM.
#2
A couple other projects in the camp.
93 SC with 2JZGTE swap and twin GT35R turbos, 768whp @ 26psi. Nitrous not hooked up yet (under hood pics coming soon).
93 FD RX-7 with a 2JZGTE swap (under construction).
All kinds of clearance issues (which will all be resolved). Hood, intake, firewall, radiator and piping.
93 SC with 2JZGTE swap and twin GT35R turbos, 768whp @ 26psi. Nitrous not hooked up yet (under hood pics coming soon).
93 FD RX-7 with a 2JZGTE swap (under construction).
All kinds of clearance issues (which will all be resolved). Hood, intake, firewall, radiator and piping.
Last edited by puff; 05-10-10 at 06:49 PM.